![]() |
English Brochure | Deutsche Website | Deutsche Infobroschüre |
![]() |
Rapid Installation | ||||||||||||||||||||||||
|
|
Rapid installation In August 2005 in the bad weather and floods in Lucerne, 8 people set up a 320 metre long Beaver hose dam in 1.5 hours!!! The ability to set up a protective dam quickly is vital in bad weather and floods. Adding a further hose on top increases the dam height quickly and easily. Important: The high water mark should not exceed the dam height of the Beaver double element. Placing a third hose on top is possible for emergencies only.
|
|
|||||||||||||||||||||||
| Beaver Protection Systems Ltd. • Rothmatte 2 • 6022 Grosswangen • Switzerland • phone +41 (0)79 549 72 60 |

