English Brochure   |    Deutsche Website    Deutsche Infobroschüre
Rapid Installation    

Rapid installation

In August 2005 in the bad weather and floods in Lucerne, 8 people set up a 320 metre long Beaver hose dam in 1.5 hours!!!

The ability to set up a protective dam quickly is vital in bad weather and floods. Adding a further hose on top increases the dam height quickly and easily. Important: The high water mark should not exceed the dam height of the Beaver double element. Placing a third hose on top is possible for emergencies only.

easy transportation to emergency site
deploy
unroll
inflate
connect
fill with water (deflate at the same time)
ready for use
   
Assembly instructions
Instruction de montage